Tuotian Bailey Bridge: Your Fast-Pass Solution

Whether it's emergency response, temporary access roads, or permanent bridges, we deliver fast, reliable, and cost-effective solutions to ensure your project succeeds.

Bailey Bridge Model Comparison


The CB100 and CB200 Bailey Bridge exhibit significant differences in design, performance, and application. Below is a detailed comparison of the two models to help you make the optimal choice based on your project requirements.

Characteristics

CB100 Bailey Bridge

CB200 Bailey Bridge

Design Philosophy

Classic military standard design, highly versatile, and quick to assemble

Optimized based on the CB100 model, enhancing load-bearing capacity and span

Core Component Dimensions (Bailey Panel)

Height: Approximately 1.45 meters

Height: Approximately 2.13 meters, significantly taller

Weight of a single Bailey panel

Approximately 270 kilograms

Approximately 320 kilograms, heavier in weight

Load Capacity and Span

Suitable for light to medium loads with relatively short spans

Offers greater load capacity, suitable for heavy loads with spans up to 60 meters or longer

Primary Applications

Emergency disaster relief, temporary roadways, small-to-medium-sized engineering projects

Heavy-duty construction projects, long-term permanent bridges, large-scale military transportation

Unparalleled Core Advantages


Our Tuotian Bridge solutions deliver exceptional value and assurance for your projects through their unique design and material advantages.

🚀

Fast Delivery

15-30 day lead time, efficiently addressing your urgent project needs for rapid deployment.

🌍

Global Export

Our products are exported to 30 countries worldwide, backed by extensive international project experience and familiarity with global standards and procedures.

🔧

Easy Installation

Modular design requires no heavy machinery—installation is effortless using manual labor or simple equipment.

🛡️

Military-Grade Quality

Manufactured to strict military standards, our products deliver reliable quality and robust load-bearing capacity, ensuring the highest safety assurance.

Project Success Stories


Our Bailey bridge solutions have been successfully deployed in numerous countries and regions worldwide. Below are some of our featured projects.

Selected Project Cases

Myanmar Disaster Relief - 33.528M Single-Lane Type 200 Bailey Bridge

Myanmar Disaster Relief - 33.528M Single-Lane Type 200 Bailey Bridge

A 33.528-meter single-lane Type 200 Bailey Bridge was deployed to rapidly construct a temporary bridge over flood-damaged roads, ensuring the smooth delivery of relief supplies.

Myanmar, 2024

Get a Free Quote
Nepal Temporary Bridge Project - 24.384M TSR3 Single-Lane 200 Series

Nepal Temporary Bridge Project - 24.384M TSR3 Single-Lane 200 Series

Deploying the 200 Series 24.384M TSR3 single-lane Bailey Bridge to provide temporary access solutions for remote mountainous regions, ensuring the smooth flow of relief supplies and transportation.

Nepal, 2021

Get a Free Quote
Emergency Road Repair in South African Mining Area - 48.76M TSR Single-Lane 200-Type Bailey Bridge

Emergency Road Repair in South African Mining Area - 48.76M TSR Single-Lane 200-Type Bailey Bridge

Providing temporary road repair support to accommodate heavy-duty vehicle traffic in mining areas, ensuring uninterrupted material transportation and production operations.

South Africa, 2018

Get a Free Quote

In-Depth Case Study: CB200 Bailey Bridge Supports Philippine Access Road Project

Bailey Bridge

The client required rapid construction of a temporary bridge in the rainy Philippines to accommodate heavy machinery. The project site featured complex terrain, making traditional reinforced concrete bridges impractical due to their lengthy construction cycles, high costs, and unsuitability for temporary needs. Our engineering team arrived on-site within 24 hours. Through precise surveys, they proposed a customized solution utilizing the “Double-Deck (DD) CB200 Bailey Bridge.”

 

Leveraging its modular design and high load-bearing capacity, we rapidly mobilized all components and completed bridge erection and acceptance within just 5 days. The bridge successfully supported construction vehicles weighing up to 70 tons, ensuring project schedule adherence. Compared to conventional solutions, the construction cycle was reduced by 80%, significantly lowering the client's overall costs.

Get a Free Quote

Why choose us as your partner?


We not only provide high-quality Bailey Bridge products but also offer comprehensive professional services spanning the entire process—from survey and design to installation and maintenance—ensuring your project is completed smoothly and efficiently.

Our One-Stop Service Process

1

Requirement Discussion and Site Survey

Thoroughly understand your project requirements, environmental conditions, and technical specifications.

2

Customized Solution Design

Our engineering team tailors the most optimized and cost-effective bridge solution for you.

3

Component Manufacturing and Delivery

Strictly adhere to national standards during production to ensure product quality and timely delivery to the project site.

4

Professional Installation Guidance and Support

Dispatch experienced technicians to provide on-site installation guidance, ensuring construction safety and quality.

Authentic Customer Reviews

Bailey Bridge

“Their response time is incredibly fast! When we encountered obstacles during project construction, they provided a solution within two days and had the bridge erected within a week—truly remarkable efficiency!”

— South Africa--Phoenix Corporation Inc

Bailey Bridge

“The bridge's quality is exceptionally solid. Our hundred-ton heavy trucks have been running on it for over half a year without a single issue. Their technical support is also thorough and reliable.”

— Ecuador--CONSTRUCTORA GOMEZ S.A. CONSTRUGOSA

Key Technical Parameters at a Glance


The load-bearing capacity of Bailey Bridges is closely related to span length and reinforcement methods. Using the interactive chart below, you can visually explore performance characteristics across different configurations. Select your desired bridge model to view its maximum design load capacity for various span lengths.

Select bridge model:

Single-layer Single-row (SS) Double-layer Single-row (DS) Double-layer Double-row (DD) Triple-layer Double-row (TD)
Bailey Bridge
Bailey Bridge
Bailey Bridge
Bailey Bridge

Contact us immediately to kickstart your project


Simply fill out the information below, and our engineering consultants will reach out to you within 24 hours to provide complimentary technical consultation, preliminary design proposals, and detailed quotations.

Submit your information to receive a free plan and quote
%{tishi_zhanwei}%

Contact us immediately to kickstart your project

Simply fill out the information below, and our engineering consultants will reach out to you within 24 hours to provide complimentary technical consultation, preliminary design proposals, and detailed quotations.

Submit
%{tishi_zhanwei}%