Project Location: Yangchun, Yangjiang, Guangdong, China
Product Used: Bailey Construction Trestle Bridge and Steel Tubular Support System
Project Overview:
Located in Yangchun, Guangdong, this 210 m construction trestle bridge provides temporary access for a mountainous construction site. The surrounding terrain features a deep ravine and pronounced changes in elevation. An elevated crossing creates a route for equipment movement and material transport between construction areas.
Bailey trusses are arranged beneath the deck and supported by multiple groups of steel tubular columns and transverse support beams. Horizontal members and diagonal bracing connect the columns, with several concrete foundation bases visible at ground level. The photograph shows the trestle during construction, with a crawler crane positioned on the deck.
Rather than an over-water access route, this project features a hillside-to-hillside crossing carried on tall supports. The Yangchun installation illustrates the use of a Bailey construction trestle bridge for mountain access, combining an upper steel truss structure with a braced tubular support system to accommodate the ravine below.
