Tuotian Bailey Bridge

Products

+
  • Hff48b8a13e1748649d025c0717308e81i.png
  • IMG_3345(20200908-104339).png
  • IMG_3501(20200908-104930).png
  • IMG_3668(20200908-105501).png
  • 微信图片_20180529205309.png

Prefabricated Pedestrian Bridge


Model Name :

Urban flyover

Current Project :

Type 200; Special steel trusses, etc.

Derived Model:

321 type Bailey Panel,200 type Bailey Panel,etc.


keyword:Tuotian Bailey Bridge


 Specification:

 

Product name: Urban flyover
nickname: Sidewalk, steel structure footbridge; urban footbridge; steel temporary bridge; temporary access road; temporary temporary bridge; Bailey
footbridge;
model: Type 321; Type 200; Special steel trusses, etc.
Commonly used truss piece model: 321 type Bailey Panel,200 type Bailey Panel,etc.
The largest single span of steel bridge design: Around 60 meters
Standard lane width of steel bridge: 1.2 meters, 1.5 meters, 2 meters or customized according to requirements.
Load class: Crowd load or small vehicle traffic. Generally not more than 5 tons.
Design: According to the difference of span and load, select the appropriate row.
Main material of steel bridge: GB Q345B
Connection pin material: 30CrMnTI
Connecting bolt grade: 8.8 grade high-strength bolts; 10.9 grade high-strength bolts.
Surface corrosion: Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc.
Bridge erection method: Cantilever pushing method; in-situ assembly method; mound construction method; hoisting method; floating method, etc.
Installation takes time: 3-7 sunny days after abutment and other conditions are met (determined according to bridge length and site conditions)
Installation requires workers: 5-6 (determined according to site conditions)
Equipment required for installation: Cranes, hoists, jacks, chain hoists, welders, generators, etc. (Can be adjusted according to site conditions)
Steel bridge features: Low cost, beautiful appearance, light fittings, quick assembly, interchangeable, detachable, long life.

Latest Faq


1
We are a specialized steel bailey bridge manufacturer with leading manufacturing process for steel bailey bridges in China, who has engaged in this field for over 10 years with an international Quality System Certification of ISO9001:2015. In addition to this,we have good market reputation overseas, like Nepal,Myanmar,the Philippines,Cambodia,Bangladesh, Papua New Guinea ,Peru,Columbia,Ecuador......

1
A: If you have the drawing, we can offer you our quotation accordingly. lf you have no design, our engineer will design for you to confirm. And then offer you a quotation.

1
We will provide detailed instruction photos and videos to you. If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help for installation. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.

Please Feel Free To Contact Us!