Project Location: Ecuador
Product Used: CB200 (Type 200) Bailey Bridge
Project Overview:
Located in Ecuador, this 30.48 m Type 200 Bailey bridge crosses a mountain watercourse to connect access roads on opposite banks. Dense vegetation surrounds the site, while cobbles and large boulders cover the riverbed. Bridge assembly and approach earthworks share the available bank-side working areas.
The photograph captures on-site assembly, with silver-grey steel trusses extending along the crossing and additional panels stacked in the foreground. Workers and excavators occupy the approach areas on both banks. Gabion baskets are visible near the foreground, while rock placement and a gravel approach define the far entrance, showing bridge installation alongside preparation of the surrounding ground.
The Ecuador project highlights the practical coordination of a CB200 modular steel bridge installation in a rocky river setting. Its panel storage, assembly areas and approach works provide a visual reference for organising prefabricated Bailey bridge components and connecting the crossing to local access routes.