Project Location: Changde, Hunan, China
Product Used: Bailey Construction Trestle Bridge
Project Overview:
Located in Changde, Hunan, this 36 m construction trestle bridge crosses a waterway beside a wooded hillside, providing access between bank-side construction areas. An exposed rock slope, loose shoreline stones and nearby construction scaffolding define the site setting.
The side view shows dark-green Bailey trusses beneath the deck, with parallel truss rows forming the load-bearing framework. Repeating chords, diagonal members and panel connections are clearly visible. The bridge meets concrete supports at the banks, and no intermediate support is visible in the water beneath the pictured crossing.
The Changde project highlights the integration of a temporary steel access bridge with rocky shoreline terrain. Its elevated alignment connects working areas across the water, providing a route for site personnel and material movement. The installation illustrates the use of a Bailey trestle bridge for construction access alongside steep slopes and confined bank-side workspaces.