Project Location: Cambodia
Product Used: CB200 (Type 200) Bailey Bridge
Project Overview:
Located in Cambodia, this 207.26 m CB200 Bailey bridge crosses a river through a multi-span arrangement. Waterfront buildings and vessels are visible around the site. Groups of in-water supports carry successive bridge sections, forming a roadway connection across the water.
Viewed from the river, the central sections feature taller side trusses, while the adjoining sections have a lower structural profile. This variation creates a distinctive bridge elevation. Steel pipe piles are arranged in groups, with cross-bracing visible between some members. Prominent black-and-yellow markings identify the support locations above the waterline.
The project combines different truss sections with multiple in-water support groups, dividing the total 207.26 m crossing into individual spans. It illustrates the configuration of a CB200 modular steel bridge for an extended river crossing, providing a reference for coordinating multi-span superstructures and supporting pile groups.
