You are here: Home / Products / Bailey Bridges / CB100 Bailey Bridge / CB100 Bailey Bridge

PRODUCT CATEGORY

CB100 Bailey Bridge

The CB100 Bailey Bridge is a prefabricated modular steel bridge designed for rapid transportation, assembly and installation. Its main structure consists of high-strength steel truss panels connected by pins, together with transoms, stringers, bridge decking, bracing frames and standardized accessories. The interchangeable components can be packed and transported separately, simplifying on-site installation, dismantling, inspection and replacement. According to the required span, roadway width, design load and site conditions, the truss arrangement and deck system can be configured accordingly. This flexible structural system provides efficient bridge construction, convenient maintenance and the possibility of dismantling, relocation and reuse after inspection.
Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

CB100 Bailey Bridge: Key Advantages and Technical Features

The CB100 Bailey Bridge combines standardized modular construction, flexible structural configurations and efficient on-site assembly. As a prefabricated modular steel bridge system, its truss arrangement, roadway width and deck system can be customized according to the required bridge span, design load, applicable standards and site conditions. Its interchangeable components also simplify transportation, installation, inspection, maintenance and future replacement.

  • Painted and Hot-Dip Galvanized Surface Options

    The standard surface finish for the CB100 Bailey Bridge is a protective painted coating, normally supplied in green. The green painted CB100 Bailey Bridge provides a consistent appearance and basic corrosion and rust protection under normal service conditions.

    Hot-dip galvanizing is available as an optional surface treatment for suitable fabricated steel components. Compared with the standard painted finish, a hot-dip galvanized CB100 Bailey Bridge generally provides better corrosion and rust resistance, making it more suitable for humid, rainy or other demanding environments. The final surface protection system should be selected according to the exposure conditions, expected service life and maintenance requirements of the project.

  • Standardized CB100 Modular Steel Bridge Design

    The CB100 modular steel bridge is manufactured from standardized and interchangeable steel components. A standard Bailey panel measures approximately 3408 mm in length and 1450 mm in height, facilitating structural configuration, packing, transportation and on-site handling.

    Bailey panels, transoms, reinforcing chords, deck panels, bracing and connecting components can be manufactured separately and inspected before shipment. This modular design allows individual parts to be checked, maintained or replaced when necessary without replacing the complete bridge system.

  • Fast Pin-Connected Prefabricated Steel Bridge Assembly

    CB100 Bailey Bridge components are manufactured before shipment and assembled at the installation site. Contractors can therefore plan delivery, lifting and installation around a defined set of bridge sections and connection parts. The modular format is useful where extensive on-site steel fabrication would be difficult. Installation methods and schedules still depend on site access, lifting equipment, foundations and an approved construction plan; they are confirmed for the actual project rather than assumed from the product type.

  • Custom CB100 Bailey Bridge Configurations

    The CB100 Bailey Bridge is not restricted to one structural arrangement. Single-row or multiple-row truss configurations, different roadway widths, deck systems and auxiliary components can be selected according to the bridge span, vehicle type, design load, applicable standard and site conditions.

    Each custom CB100 Bailey Bridge configuration should be verified through project-specific engineering calculations. This flexibility allows the bridge to meet different technical and traffic requirements while retaining the production, transportation and assembly advantages of a standardized modular system.

  • Transportable and Reusable Temporary Steel Bridge

    The complete bridge can be dismantled into standardized components that are convenient for road or containerized transportation. These interchangeable parts simplify loading, unloading, inventory management and field operations.

    After completing a project, the reusable temporary steel bridge can be dismantled, inspected, transported and reassembled at another suitable location. Before reuse, the condition of the primary load-bearing components, connections and protective finish must be checked and confirmed to comply with the relevant technical requirements.

  • CB100 Bailey Bridge Manufacturer and Technical Support

    Hunan Tuotian has specialized in Bailey bridges, modular steel bridges and related components since 2014. As a professional CB100 Bailey Bridge manufacturer, we complete the principal fabrication and welding of major structural steel components under controlled factory conditions.

    Depending on the project requirements, quality control can include material verification, dimensional inspection, welding inspection, coating or galvanizing inspection, trial fitting and pre-shipment checking. Based on the technical parameters confirmed by the customer, Hunan Tuotian can also provide bridge configuration recommendations, technical drawings, component lists, packing guidance and installation support.

TECHNICAL PARAMETER

VALUE

Product name

CB100 Bailey Bridge

Model number

CB100 / Compact 100

Structure

Modular steel truss bridge

Truss Size(Hole Center Distance)

3048*1450MM

Material options

Q235B / Q345B / Q355B; grade by approved design

Surface treatment

Painting or hot-dip galvanizing

Fabrication

Cutting, forming, drilling/punching, welding

Place of origin

Hunan, China

Deck clear width

Project-specific; confirm on drawing

Span & design load

Determined by project-specific structural design

Reference standard

As agreed in the project technical specification

100 Truss Press Limited Table

No.

Internal Force

Structure Form

Not Reinforced Model

Reinforced Model

SS

DS

TS

DD

SSR

DSR

TSR

DDR

100

Standard Truss Moment(kN.m)

788.2

1576.4

2246.4

3265.4

1687.5

3375.0

4809.4

6750.0

100

Standard Truss Shear(kN.m)

245.2

490.5

698.9

490.5

245.2

490.5

698.9

490.5

100 Table of Geometric Characteristics of Truss Bridge(Half bridge)

Type No.

Geometric Characteristics

Structure Form

Not Reinforced Model

Reinforced Model

SS

DS

TS

DD

SSR

DSR

TSR

DDR

100

Section Properties (cm³)

3578.5

7157.1

10735.6

14817.9

7699.1

15398.3

23097.4

30641.7

100

Moment of Inertia (cm⁴)

250497.2

500994.4

751491.6

2148588.8

577434.4

1154868.8

1732303.2

4596255.2

image.png
image.png

Applications of the CB100 Bailey Bridge

The CB100 Bailey Bridge can be configured for different temporary and project-based transportation requirements. Its final structural arrangement should be determined according to the required span, length, width, design load, site conditions and applicable engineering standards.

  • Emergency Bridge and Disaster Recovery

    After floods, earthquakes, landslides or other natural disasters damage existing roads and bridges, the CB100 Bailey Bridge can be configured as an emergency bridge to restore essential vehicle and personnel access. Its modular components can be transported separately and assembled according to the confirmed site conditions. The final span, length, width, and load configuration must be determined from the emergency transport requirements, river conditions and available foundations.

  • Temporary Traffic During Bridge Maintenance

    During the repair, replacement or widening of an existing bridge, a CB100 temporary steel bridge can provide an alternative traffic route. It helps contractors maintain the movement of local vehicles, construction equipment and project personnel while work continues on the permanent structure. The temporary bridge arrangement should be designed according to expected traffic, installation space, approach-road conditions, required service period and the applicable local bridge standard.

  • Construction Access Bridge

    The CB100 Bailey Bridge can serve as a construction access bridge for highway, railway, water conservancy and large civil engineering projects. It may be used to cross rivers, ditches, soft ground or other obstacles between the public road and the construction area. Roadway width, deck type and structural configuration can be selected according to the construction vehicles, equipment dimensions, axle loads and frequency of use specified by the project.

  • Mining, Hydropower and Energy Projects

    Mining, hydropower, energy and remote infrastructure projects often require reliable access where permanent roads or bridges are not yet available. A CB100 modular steel bridge can provide a practical connection for transporting workers, materials and approved project vehicles. Because the bridge can be delivered as standardized components, it is suitable for locations with restricted road access. Every configuration should nevertheless be verified against site terrain, environmental conditions and design loads.

  • River, Ravine and Rural Road Crossings

    For river, ravine and rural road crossings, the CB100 Bailey Bridge can provide a modular connection where conventional bridge construction is difficult or time-consuming. The bridge system can be configured for different roadway widths and vehicle requirements after the project parameters are confirmed. If the bridge is intended for long-term traffic, its foundations, corrosion protection, drainage, deck system, inspection schedule and maintenance plan should comply with the applicable engineering standards.

1. How can I get a Bailey bridge quotation?

Please provide the required product type, bridge span, roadway width and design load. If available, you may also send engineering drawings, tender documents, technical specifications or site photographs. Our technical team will evaluate the information and provide a suitable technical proposal and product quotation based on your confirmed project requirements.

2. Can you provide customized Bailey bridge solutions?

Yes. We can provide customized Bailey bridge and modular steel bridge solutions according to the required span, roadway width, vehicle type, design load, service period, environmental conditions and applicable engineering standards. After reviewing the project information, our technical team will confirm the final bridge configuration, component quantities, surface treatment and other technical requirements.

3. Do you provide Bailey bridge technical support and installation guidance?

Yes. Hunan Tuotian can provide product selection assistance, bridge configuration recommendations, technical drawings, packing guidance, installation documents and remote technical support.

On-site installation guidance can also be discussed according to the project location, construction conditions and required service scope. All installation work should follow the approved technical drawings and applicable local safety requirements.

4. How are modular steel bridges shipped internationally, and what is the delivery time?

Modular steel bridges and bridge components can be separated into standardized units for export packing and international transportation. We can recommend suitable packing and shipping arrangements according to the product type, order quantity and destination.

Production and delivery time depends on the bridge configuration, order quantity, material requirements and factory production schedule. The estimated schedule will be confirmed after the technical specifications and order details are approved.

5. What warranty and after-sales services do you provide?

Hunan Tuotian normally provides a warranty period of 6 to 12 months according to the product type, project requirements and contract terms. After-sales services may include technical consultation, installation guidance, maintenance recommendations, component identification and spare-part supply.

The exact warranty period, starting date and coverage will be specified in the contract. Damage caused by incorrect installation, overloading, unauthorized structural modification or improper maintenance is normally excluded from the warranty.

Previous: 
Next: 

CONTACT US

WhatsApp: +8618597771096 
Address: Changfu Project Area, Baishu Ind. Zone, Guiyang County,Hunan province.PRC (424400)

QUICK LINK

PRODUCT CATEGORY

ABOUT US

RESOURCES

Leave a Message
Copyright © 2026 Hunan Tuotian Road & Bridge Engineering Machinery Co., Ltd. All Rights Reserved.|Sitemap|Privacy Policy