You are here: Home / Projects / Overseas Project / Botswana Reserve Type 200 Bailey Bridge Project

Botswana Reserve Type 200 Bailey Bridge Project

Botswana Reserve Type 200 Bailey Bridge Project

Project Location: A Protected Reserve, Botswana

Product Used: CB200 (Type 200) Bailey Bridge

Project Overview:

Located within a protected reserve in Botswana, this 27.43 m Type 200 Bailey bridge connects roads across a channel bordered by trees and shrubs. In addition to the main roadway, the bridge incorporates an external pedestrian walkway, providing separate spaces for vehicles and people at the same crossing.

Silver-grey steel trusses line both sides of the main deck. On the near side, a walkway runs outside the truss and is fitted with continuous metal railings. It extends parallel to the roadway and meets a separate bank-side access area. High-visibility markings identify the truss end posts, while existing roadside barriers meet the vehicle entrance.

The project’s defining feature is the combination of a CB200 modular steel bridge with an external footway. This Bailey bridge with pedestrian access illustrates how roadway and walkway arrangements can be coordinated, offering a practical reference for deck zoning, side attachments and approach connections within a reserve setting.

CONTACT US

WhatsApp: +8618597771096 
Address: Changfu Project Area, Baishu Ind. Zone, Guiyang County,Hunan province.PRC (424400)

QUICK LINK

PRODUCT CATEGORY

ABOUT US

RESOURCES

Leave a Message
Copyright © 2026 Hunan Tuotian Road & Bridge Engineering Machinery Co., Ltd. All Rights Reserved.|Sitemap|Privacy Policy